Environmental Impact Assessment Projects
1. Maasai Mara students’ hostel, Maasai mara University (2014).
2. Tesla cancer hospital, Quadco 254(2016).
3. Ganze-Bamba water supply project, Redcross Society (2017).
4. Maungu-Buguta water supply project, Redcross Society (2017).
5. Nakruto water supply project ,Redcross Society (2017).
6. Kaloleni water supply system, Redcross Society (2017).
7. Kisambinyi Konenyi wate project, Redcross Society (2017).
8. Mbumachi water supply Rehabilitation project, Redcross Society (2017).
9. Child protection unit at Marimanti ,Plan international(2017)
10. Ganze health centre incinerator in ganze, Plan international(2018)
11. Kamkomani dispensary incinerator in kaloleni, Plan international(2018)
12. Marereni dispensary incinerator, Plan international(2018)
13. ECDE classroom, toilet block and kitchen ataLWala Kadawa pri school in Kisumu, Plan international(2021).
14. Installation of LPG reticulum system and bulk storage tanks at AAR hospital, AAR Hospital(2021)
15. Refurbishment and extension work in Mangororo primary school, Plan international(2022).
16. Refurbishment and extension work in Matolani primary school,Plan international(2022).
17. Icolo data centre in Nyali , Icolo.io(2020)
18. Refurbishment and extension work in Magogoni primary school, Plan international(2022).
19. Aquavista Residency in nyali, Blue Regency INV LTD(2022)
20. Extension work at Mikuluni primary school, Plan international(2022).
21. Students Hostel In Parklands, Best View Holdings LTD(2022)
22. Extension work at Kimbule primary school, Plan international(2022).
23. Construction of riverdrift residencies, Squametric LTD(2022)
24. Extension work at Migodomani primary school, Plan international(2022).
25. Construction of two blocks in athi river (Nova Pri sch), Nova pioneer academy(2019).
26. Proposed construction of Bamburi Palm Villas in , Mombasa County, Zawadi heights ltd(2023)
27. SUEA for the proposed construction of Tesla Cancer Hospital, Tesla Cancer Hospital LTD(2023)
Environment Audit Projects
1. Maasai mara university(2014)
2. Nolfolk Towers PLc Audit, Norfolk Towers PLC(2020).
3. Standard Group Media Audit, Standard Group Media (2018).
4. Kay group centre Audit, Kay group Centre(2021)
5. Greenhouse Mall Audit, Greenhouse Mall(2016,2018,2020,2021,2022)
Environmental and Social Impact Assessment
- Tesla Cancer Hospital Ltd
- Kenya Red Cross Society
Effluence Discharge Licensing
1. EDL for Nova Pri Sch in Athi river, Nova pioneer academy(2018)
2. EDL for NORFOLK Towers, Norfolk Towers PLC(2020)
Head office.
- The Greenhouse, Adams Arcade, Ngong Road, 4th Floor, Suite 23, East Wing, P.O. Box 21133-00505, Nairobi | Kenya.
- +254(0)203862204
- info@greenkenya.org